|
Unless you arrived at this web page via a search engine, it was opened in a new window.
Below: Low impact erosion prevention, high flow and turbulence flood channel/spillway. image 3 of 8.
Topic of gallery: Referential demo gallery, green erosion prevention utilizing natural vegetation to reinforce the drainage-trenching, runoff-diversion structure.
Pictured below: overview of StabiliGrid slope erosion prevention units installed, before the steeply sloped channel is backfilled with top soil and vegetated.
Please notice again the minimal ground preparation and soil disturbance required, pre-construction of this flow channel.
|