|
Unless you arrived at this web page via a search engine, it was opened in a new window.
Below: Low impact erosion prevention, high flow and turbulence flood channel/spillway, image 5 of 8.
Topic of gallery: Referential demo gallery, green erosion prevention utilizing natural vegetation to reinforce the drainage-trenching, storm water runoff-diversion structure.
Pictured below: long overhead view of StabiliGrid slope erosion prevention units installed, before the steeply sloped channel is backfilled with top soil and vegetated.
Please remember this gallery demontrates the design/construction of this flood channel/diversion system. It will eventually be vegetated with native plants that have deep/strong root zone developments.
|