|
Unless you arrived at this web page via a search engine, it was opened in a new window.
Below: Low impact erosion prevention, high flow and turbulence flood channel/spillway, image 6 of 8.
Topic of gallery: Referential demo gallery, green erosion prevention utilizing natural vegetation to reinforce the drainage-trenching, storm water runoff-diversion structure.
Pictured below: long wide-angle view of StabiliGrid slope erosion prevention units installed, before the steeply sloped channel is backfilled with top soil and vegetated.
Please remember this will eventually be vegetated with native plants that have deep/strong root zone developments. It is necessary to provide pre-vegetation images to demonstrate the unique characteristics of low-environmental profile design and execution.
|