Home
||
Infiltration Trench
Fairfield, Iowa NRCS pilot project
|
YouTube Video, Fairfield, Iowa - Pervious Parking Construction
|
The Beginning 8/27/06 Pictures
|
Reshaping, the earthmoving begins 8/29
|
Finishing up Preparations, 8/31 thru' 9/24
|
Monday 9/25/06 Pictures
|
Installing the Grids
|
Backfilling and Finishing Up
Watch the Video
Select a Section ...
Fairfield, Iowa NRCS pilot project
YouTube Video, Fairfield, Iowa - Pervious Parking Construction
The Beginning 8/27/06 Pictures
Reshaping, the earthmoving begins 8/29
Finishing up Preparations, 8/31 thru' 9/24
Monday 9/25/06 Pictures
Installing the Grids
Backfilling and Finishing Up
« Previous
||
Thumbnail Page
||
Next »
One infiltration trench being backfilled.
First a 4" drainage tile was layed in the bottom of the trenches.
We hope that no rainfall makes it to the end of this trench,
that it will percolate into the soil before spilling.