Pictured below: Construction equipment such as tractors, backhoes, and lumberyard delivery flatbed trucks drove on top of the grass for two months. No damage to the grass or tree roots, or to the native soil, structure, resulted heavy construction/expanion project.
Additionally, the use of StabiliGrid prevented stormwater runoff into the neighborhood streets and storm water runoff removal systems.
At completion of this two-month project, resodding was not required, because the grass lawn remained healthy and verdant with zero degradation of the grass root development, or to the soil integrity.
|