Laying the baseline row. DCP02778
The baseline is layed out.
This will set the form, for the entire installation.
They will lay the grids from this base line. DCP02779
Always important to stop and check, before continuing.
With 2 persons, it goes pretty quickly.
Following the baseline, all the grid rows are square.
Just drop, align the tabs and slots, and snap into place.
This will eventually be angled parking on grass.
Beginnning to take shape.
The Hero and the anti-hero.
No impervious asphalt required.
This entire parking area will act as an infiltration asset.
Preparing to trim the grids to the paved area.
How easy is that?
Cut-to-fit at the site.
With 2 persons, it goes pretty quickly.