Ground Preparation
Click on an image to view.
Overview of Area - DCP02767.jpg
Layout and Marking - DCP02768.jpg
StabiliGrid Delivered - DCP02769.jpg
This additional drain rock base was not specifed in the contract. DCP02770
Creating a centerpoint and drawing a line. DCP02771
Leveling the base. DCP02772
Box Scraper worked great. DCP02773
The driver was a real pro. DCP02774
The "rough grade" scraper. DCP02775
Finishing up the grading and ground prep.DCP02776
This is why all the extra drain rock was added. DCP02777