Pervious Live Grass Parking Project using StabiliGrid     |     home
Navigation: Previous  Photo ||  UP to the Thumbnail Page ||                  



Sedimentation and erosion prevention at this green grass parking construction project
<< Previous Photo  ||  {Back}  ||                     
Eric Hogan told us he was amazed at how well the StabiliGrid installation is holding up and performing.
The photo below was taking the day after a "gully washer" deluge.
As you may see, a great amount of erosion and sedimentation occurred wherever the StabiliGrid was not installed.
Where StabiliGrid was installed:  no erosion or sedimentation - even though the installation was yet incomplete.
It is obvious that, if the entire area disturbed by the construction project had been protected by StabiliGrid, there would have been little if any stormwater runoff, and NO erosion or sedimentation, anywhere.